Renovation and architectural-plant design of the multifunctional hall

The Old Mill, that houses the polyvalent hall, has been the subject of an in-depth preliminary study that has led to an accurate and precise design of the project, following the completion of two previous lots relating to construction works, which allowed the renovation of the whole complex. The perimeter walls of the hall and the front of the stage were executed with a modular system of wooden panels, while the countertop was painted in tone colors with the materials of the room. The stage was paved with a tapped plank, while the scenic tower walls painted with a dark covering color. It should be noted that the choice of many finishing materials has been driven by the demands of acoustic studies in order to optimize the propagation of sounds in the room and also that an accurate lighting engineering study has been carried out to ensure correct quantitative and good input the quality of the artificial lighting of the hall, as well as to enhance the aesthetic features of the entrance hall and its service spaces.

Status
Completed
Period
2012 - 2013
Assignment
progettazione esecutiva, direzione lavori, piano coordinamento sicurezza
Client
Comune di Nuvolento
Amount
€ 272.103